Engineer is appointed member of the NFPA Committee 59A on LNG Facilities Siting
Dr. Filippo Gavelli was appointed to the technical committee responsible for NFPA 59A, Standard for the Production, Storage, and Handling of Liquified Natural Gas (LNG). He has several years of experience with the analysis of LNG hazards and had previously served on the NFPA 59A committee from 2007 to 2009. Dr Gavelli currently leads GexCon US' consulting activities related to LNG hazard analyses and LNG facility siting.
Another GexCon Engineer Dr. Scott Davis is already serving as a Principal member of the technical committee responsible for NFPA 720 Standard Installation of Carbon Monoxide (CO) Detection and Warning Equipment. He has experience in the formation, migration, detection, exposure and mitigation of carbon monoxide. Dr. Davis has investigated the cause of carbon monoxide (CO) exposures that allegedly resulted from poor combustion in furnaces, boilers, portable space heaters, portable generators and motor vehicles.
GexCon joins Steering & Technical Advisory Committees of the Mary Kay O'Connor Process Safety Center
Engineer is appointed member of the NFPA Committee 59A on LNG Facilities Siting
GexCon paper on 2006 Danvers explosion findings has been published in Journal of Loss Prevention in the Process Industry.
